Year
2013- 2014
Size
Passenger Terminal
Scope
New island ferry terminal including floating quay on City Hall Pier 4
Characteristics
From 2013 Nyvoll Consult has been involved in the design, announcement and implementation of the New Island Ferry Terminal on City hall Pier 4. The Hall Pier 4 is land acquired with granite and cobblestone surfaces. Spoolers are implemented and the facility is universally designed. As an extension of the City Hall Pier 4, it built a 14 x 14m floating quay in concrete with wooden superstructure and internal ramps adapted universal design according to tidal water tanges and loads.
Nyvoll Consult as has been the developer adviser in a turnkey.
Construction in 2014 and completion in 2014
Contract
Total Contract
Nyvoll Consult as
Svein Ove Nyvoll
Emploier
Oslo Harbour KF