Skjerva Bridge Mosjøen

Year

2018–2019

Size

New bridge with a span of 29 m and a total width of 11 m.

Scope

Verification of flood conditions, as well as assistance with design and construction.

Specification

Skjerva Bridge is a new single-lane reinforced concrete bridge crossing the Skjerva River in the centre of Mosjøen. The bridge was designed to withstand a 200-year flood event and was completed in record time, with design work commencing in October 2018 and special transport of transformers across the bridge to the Øyfjellet Wind Farm taking place in mid-February 2019.

 

Nyvoll Consult AS assisted NRC Anlegg with the complete structural design of the bridge. The site consists of deep deposits of silt and clay. Each abutment was founded on two driven open-ended tubular steel piles, with the load-bearing capacity calculated by NGI.

 

The bridge consists of prefabricated prestressed NTB1200 girders with a cast-in-place concrete bridge deck and reinforced concrete abutments.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

NRC Anlegg

Contact Person

Stig Lien