Year
2016
Size
2,250 m² parking basement with four-story residential apartments above ground.
Scope
Design of reinforced concrete basement structure.
Specification
In 2016, Nyvoll Consult AS was commissioned by Buskerud Betongvarefabrikk AS to design a parking basement constructed using cast-in-place reinforced concrete, precast shell wall elements, and filigree slab systems. The parking basement has an area of 2,250 m² and is founded on steel core piles.
A four-storey modular building was constructed on the deck above the basement. The deck was designed as a flat slab, with the modular buildings supported on masonry strip foundations. No beams were used in the deck structure.
As the first project of its kind in Norway, Nyvoll Consult AS designed and detailed the Bamtec reinforcement system, providing Buskerud Betongvarefabrikk AS with several construction advantages.
Nyvoll Consult AS was appointed as the client's structural engineering consultant (RIB) throughout both the detailed design phase and the construction phase.
Construction started in 2016 and was completed in 2016.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Client
Buskerud Betongvarefabrikk AS
Contact Person
Gøran Karlsson