Dry Dock Westcon Yards

Year

2023–2025

Size

Dry dock (Length × Width × Depth = 140 × 30 × 10.5 m).

Scope

Detailed design of the complete dry dock (excluding the dock gate).

Specification

Consto Anlegg Midt/Vest constructed a new dry dock for Westcon Yards Florø. Nyvoll Consult AS was appointed as the structural engineering consultant for the project under a design and build contract.

 

The dry dock is located between two existing quays with a clear opening of 35 m. Within this opening, a new dry dock was constructed with the top of the base slab at elevation - 10.5 m, a net width of 30 m, and an outlet channel. The dock is equipped with high-capacity dewatering pumps capable of emptying the dock in approximately 3.5 hours. A reinforced concrete perimeter wall was constructed around the entire dock.

 

Sealing the construction area from the sea during the construction phase was particularly challenging due to up to 12 m of saturated soil beneath one of the existing quays. A pipe pile wall was drilled into the bedrock and restrained at the top to retain these soil masses. The temporary sea barrier was positioned to allow the entire dry dock, including the dock gate frame, to be constructed in dry conditions. Once construction was completed, the sheet pile wall and the remaining bedrock towards the sea, were removed.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

Consto Anlegg Midt

Contact Person

Morten Lyngsmo