Year
2025
Size
Bulk stone cargo pier with an overall length of approximately 200 m between the outer mooring dolphins.
Scope
Design of the pier, mooring dolphins, and foundation system.
Specification
Nyvoll Consult AS was appointed as the structural engineering consultant by Repstad Anlegg for the construction of an export terminal for bulk stone cargo. The facility consists of a 15 m wide pier with two mooring dolphins on each side. The dolphins are restrained longitudinally by tie rods connected to the pier and transversely by tie rods anchored into the bedrock just inland from the shoreline. The longitudinal tie rods, with lengths of up to 54.25 m, include an access walkway and were checked for natural frequency due to their length.
The design service life is 50 years.
The pier is constructed using precast concrete beams, precast deck elements, and a structural concrete deck slab. An adjustable slewing conveyor system is installed on the pier for loading ships.
The mooring dolphin caps, each weighing more than 56 tons, were manufactured as precast concrete elements and lifted into place using a floating crane.
The foundations consist of drilled steel tubule steel piles (Ø610 mm and Ø711 mm) socketed into bedrock and filled with concrete.
Both the pier and the mooring dolphins are equipped with cone fenders, fender panels, and mooring bollards.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Svein Ove Nyvoll
Client
Repstad Anlegg as
Contact Person
Ane Mæland