Larsneset Harstad

Year

2021–2024

Size

Piled quay with a quay frontage of 282 m.

Scope

Design of the quay, foundation system, and a freestanding 150 tonne mooring bollard on the northern side.

Specification

Nyvoll Consult AS was appointed as the structural engineering consultant by Harstad Havn KF for the construction of a new quay at Larsneset in central Harstad.


The existing concrete column-supported quay to the south and the concrete piled quay to the north were demolished, while the central block wall quay was retained and incorporated as the underlying foundation. The new quay was designed for a service life of 100 years.


The new quay has been designed to accommodate both the Coastal Express (Hurtigruten) and Havila Voyages, including shore power facilities, as well as cruise ships.


The entire area was dredged to a navigation depth of 9.5 m, including rock excavation by blasting and dredging of both soil and blasted rock.


A larger projecting front fender beam was constructed every 50 m to support pneumatic fenders for berthing larger cruise ships.

Contract Type

Main Contract

Nyvoll Consult AS

Svein Ove Nyvoll

Client

Harstad Havn KF

Contact Person

Lennart Jensen