Dolphins and Bollards in Snekkevik

Year

2016

Size

Extension of an existing industrial quay.

Scope

Construction of two mooring dolphins and two freestanding mooring bollards.

Specification

In 2016, Nyvoll Consult AS was involved in the design and construction of two mooring dolphins and a new fender system, together with two freestanding 75-ton mooring bollards at the quarry in Snekkevik, Kragerø Municipality.


The existing quay was only 12 m wide, limiting the size of vessels that could berth. The quay frontage was extended by constructing one mooring dolphin on each side of the quay, both equipped with fenders. In addition, one freestanding 75-ton mooring bollard was constructed on land along the shoreline on each side of the quay.


All structures are anchored directly into bedrock.


Nyvoll Consult AS was appointed as the contractor's structural engineering consultant under a Design and Build (Turnkey) contract.


Construction commenced in 2016 and was completed in 2016.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

ALTi Bygg og Anlegg AS

Contact Person

Erdil Kenar