Sheet pile quay wall with a quay frontage of 110 m.

Scope

Design of the quay and foundation system.

Specification

Nyvoll Consult AS was appointed as the structural engineering consultant by Harstad Havn KF for the demolition of the existing obsolete piled quay at Rødskjær in Tjeldsundet and to construct a new sheet pile quay. The existing quay remained fully operational throughout the construction period. The new quay was built with an almost identical alignment to the existing quay while providing a longer quay frontage.


The quay was constructed in two phases. The existing quay remained in operation while the first section of the new quay was built. Once the first section was completed, vessel traffic was transferred to the new quay before the old quay was demolished and the second section was completed.

The quay consists of driven steel sheet piles socketed into bedrock, with the toe of the sheet pile wall dowelled into the rock. The anchoring system consists of inclined tie rods anchored into bedrock.


The area was dredged to a navigation depth of 7 m, including rock excavation by blasting and dredging of both soil and blasted rock. Some of the excavated soil was slightly contaminated and was reused as backfill before being placed in the disposal area behind the sheet pile quay.


The quay has been designed to allow the landward area to be raised by up to 60 cm and to serve as the future rear support for a piled quay if required.