Year
2017
Size
New foundation system and new quay deck.
Scope
Construction of a new quay deck using the existing deck as permanent formwork.
Specification
The existing cruise ship quay structure was struck by a cruise ship following a strong gust of wind during berthing. The projecting pier failed, causing the quay edge at the northwestern corner to move approximately 40 cm horizontally. The horizontal anchoring system of the projecting pier was also damaged, and the entire quay deck developed a continuous crack up to 20 cm wide extending towards the quay edge.
Repair of the damaged structure was assessed as impractical. A new horizontal bracing node was therefore constructed immediately outside the existing pier and new piles were installed through openings cut in the existing quay deck. A new reinforced concrete quay deck was then cast using the existing deck as permanent formwork.
In addition, the existing fender system was re-designed and replaced with a new fender system.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Svein Ove Nyvoll
Client
ALTI Bygg og Anlegg AS
Contact Person
Stig Lien